Construction Administration
Phased Construction
Cost control begins with the design process. Accurate cost estimating
during the design phases verifies the budget is realistic throughout
changing circumstances. The budget is a working tool that is monitored
and maintained throughout design and construction. During the design
phase, we explore ways to maximize usable space. In addition, we
specify affordable materials that combine high quality and energy-efficiency
to achieve the lowest possible operating costs. Throughout the design
and construction process, consistent communication between the design
team, owner and contractor minimizes the number of changes during
construction.
|